---
格式版本: 2
标题: "Meta's $1.2bn data center in Kuna, Idaho, goes live"
原文链接: "https://www.datacenterdynamics.com/en/news/metas-12bn-data-center-in-kuna-idaho-goes-live/"
发布日期: "2026-09-04"
发布时间校准状态: "found"
发布时间需复核: "否"
发布时间来源: "llm:local:strict_original_body"
发布时间证据: "September 04, 2026 ByGeorgia ButlerHave your say"
发布时间校准原因: "正文标题附近明确标注作者署名日期为 September 04, 2026，为文章发布时间。"
发布时间校准置信度: "1"
发布时间候选数量: 25
发布时间严格候选数量: 10
发布时间原页读取状态: "source template page reused from URL open"
发布时间未找到原因: ""
发布时间校准时间: "2026-09-05T23:25:00+08:00"
发布时间仲裁状态: "confirmed"
发布时间仲裁尝试次数: 1
发布时间仲裁耗时毫秒: 3100
发现时间: "2026-09-05T23:24:42+08:00"
入库时间: "2026-09-05T15:25:27.401Z"
来源平台: "Data Center Dynamics 搜索"
搜索渠道: "source_template"
搜索词: "site:datacenterdynamics.com Meta"
匹配关键词:
  - "AI"
  - "Liquid Cooling"
  - "latency"
相关厂家:
  - "Meta"
相关专家:
  []
内容类型: "网页"
抓取工具: "Jina Reader"
清洗工具: "Jina Reader Markdown + Defuddle/Readability 正文提取"
原始附件:
  []
AI优质: "否"
AI打分: 64
AI分档: "召回候选"
AI质检状态: "不通过"
AI打分理由: "正文主线是Meta位于爱达荷州Kuna的12亿美元AI优化数据中心正式上线并承载流量，新增第二座AI优化设施投运、闭环液冷、645MW可再生能源及相关投资事实。来源为专业数据中心媒体，并引用Meta高管原始声明；固定知识库未发现同一项目上线记录，但未命中不能证明首次出现。文章具有真实部署信号，但没有AI机架拓扑、GPU规模、互连、功率密度或可复用工程机制，命中“普通或概念型数据中心/单项目宣传”否决项，因此不予高质量准入。"
AI质检模型: "gpt-5.6-sol"
AI质检时间: "2026-09-07T07:42:00+08:00"
AI主题相关性: 10
AI来源权威性: 12
AI新颖性: 15
AI技术细节: 5
AI商业部署信号: 13
AI完整性: 9
AI评分提示词版本: "v17-精简生产版"
AI评分提示词SHA256: "48fb9777f386026761b4873eaff30807694fb11e9b352d7c69bf2dfde750cc7d"
AI评分知识库版本: "knowledge_base_v1-20260819+runtime.83"
AI评分知识库SHA256: "99e157a294119176942ea3afe850c1212d561028e12ce0b35798ec5ecd3e2e24"
AI评分知识库检索词: "[\"Meta\",\"site:datacenterdynamics.com Meta\",\"CPO\",\"Liquid Cooling\",\"RAS\",\"Intel\",\"URL\",\"assets/img-55e9884d.webp\",\"assets/img-5697753f.webp\",\"DCD\",\"WebImage2\",\"assets/img-8b876234.webp\"]"
AI评分知识库命中: "[{\"id\":\"runtime-e04eba4cb287330134ac9145\",\"title\":\"Nvidia revenue doubles over last year, as company forecasts record growth\",\"sourceType\":\"ai_excellent_article\",\"time\":\"\",\"matchedTerms\":[\"RAS\",\"Intel\",\"URL\",\"assets/img-5697753f.webp\",\"DCD\",\"WebImage2\",\"assets/img-8b876234.webp\"],\"rank\":-20.667344933769602},{\"id\":\"july-correct-0025\",\"title\":\"Marvell Brings Radix, Low Latency, And Bandwidth To Bear With Teralynx T100\",\"sourceType\":\"labeled_article\",\"time\":\"2026-07\",\"matchedTerms\":[\"Meta\",\"CPO\",\"Liquid Cooling\"],\"rank\":-8.543603121459785},{\"id\":\"july-correct-0015\",\"title\":\"AMD to join the optical interconnect party with 2027 Instinct GPUs\",\"sourceType\":\"labeled_article\",\"time\":\"2026-07\",\"matchedTerms\":[\"Meta\",\"CPO\",\"URL\"],\"rank\":-7.7841101343296195},{\"id\":\"runtime-bb3ff3b1181f90d6bd6ec57c\",\"title\":\"英伟达最强 Rubin GPU 架构发布，被 Blackwell 曝光\",\"sourceType\":\"ai_excellent_article\",\"time\":\"\",\"matchedTerms\":[\"RAS\",\"Intel\",\"URL\"],\"rank\":-7.2648081412840035},{\"id\":\"runtime-ebfe0103300840358caa3312\",\"title\":\"Nvidia’s Vera CPU Will Anchor Next Phase of AI Infrastructure\",\"sourceType\":\"ai_excellent_article\",\"time\":\"2026-08-17\",\"matchedTerms\":[\"Meta\",\"Liquid Cooling\",\"RAS\",\"Intel\"],\"rank\":-7.090181798586489}]"
AI摘要: "Meta位于爱达荷州Kuna的数据中心已正式上线，成为公司第二个AI优化设施，总投资12亿美元。该设施采用闭环液冷系统，全年大部分时间零用水，并已匹配100%清洁可再生能源。"
AI摘要模型: "ali-deepseek-v4-flash"
AI摘要时间: "2026-09-07T02:07:57.177Z"
采集批次: "2026年9月5日21点47分06秒"
采集批次ID: "20260905-214706-507"
去重键: "https://www.datacenterdynamics.com/en/news/metas-12bn-data-center-in-kuna-idaho-goes-live"
---

Title: Meta's $1.2bn data center in Kuna, Idaho, goes live

URL Source: https://www.datacenterdynamics.com/en/news/metas-12bn-data-center-in-kuna-idaho-goes-live/

Markdown Content:
Opens in a new window Opens an external website Opens an external website in a new window

This website utilizes technologies such as cookies to enable essential site functionality, as well as for analytics, personalization, and targeted advertising. To learn more, view the following link: [Privacy Policy](https://www.datacenterdynamics.com/en/data-protection-privacy-policy/)

Storage Preferences

Search

[Login / Create Account](https://www.datacenterdynamics.com/en/account/login/?next=%2Fen%2Fnews%2Fmetas-12bn-data-center-in-kuna-idaho-goes-live%2F)

# [](https://www.datacenterdynamics.com/en/)

*    Channels 

Recommended for you...

![Image 1: hut 8 beacon point](./assets/img-55e9884d.webp)01 Sep 2026  # [Anthropic signs $35bn cloud agreement with Lambda - report](https://www.datacenterdynamics.com/en/news/anthropic-signs-35bn-cloud-agreement-with-lambda-report/)   

 
    *   [Energy & Sustainability Water efficiency, renewable power, carbon capture, and more](https://www.datacenterdynamics.com/en/the-energy-sustainability-channel/)
    *   [Data Center Cooling Air, liquid, and the pipes that cool facilities](https://www.datacenterdynamics.com/en/the-data-center-cooling-channel/)
    *   [Management & Operations Day-to-day operations, workforce and skills](https://www.datacenterdynamics.com/en/the-management-operations-channel/)
    *   [Mission Critical Power From grid power challenges, to on-site solutions](https://www.datacenterdynamics.com/en/the-mission-critical-power-channel/)
    *   [Edge Infra & Inference Low-latency systems and AI inference](https://www.datacenterdynamics.com/en/the-edge-computing-channel/)
    *   [Cloud & Hybrid Where workloads live and why](https://www.datacenterdynamics.com/en/the-cloud-and-hybrid-channel/)
    *   [Data Center Construction Site selection, building, and expansion](https://www.datacenterdynamics.com/en/dcd-data-center-construction-channel-news/)
    *   [Telecoms & Connectivity Telco towers, spectrum, fiber, and subsea cables](https://www.datacenterdynamics.com/en/the-networks-and-connectivity-channel/)
    *   [Investment & Markets Financing the data center build-out](https://www.datacenterdynamics.com/en/the-investment-markets-channel/)
    *   [Compute, Storage & Networking Chips, drives, and accelerating compute](https://www.datacenterdynamics.com/en/the-compute-storage-networking-channel/)

*    Media 

Recommended for you...

![Image 2: The Agentic AI Supplement](./assets/img-5697753f.webp) # [The Agentic AI Supplement](https://www.datacenterdynamics.com/en/magazines/the-agentic-ai-supplement/)

27 Jul 2026    

 
    *   [News The latest data center & AI happenings](https://www.datacenterdynamics.com/en/news/)
    *   [Long Reads Deep-dive features and interviews](https://www.datacenterdynamics.com/en/analysis/)
    *   [Industry Views Perspectives from those building the future](https://www.datacenterdynamics.com/en/opinions/)
    *   [Video Interviews Talks, Studios, and chats with the sector](https://www.datacenterdynamics.com/en/videos/)
    *   [Broadcasts Upcoming and on-demand](https://www.datacenterdynamics.com/en/dcd-broadcasts/)
    *   [Whitepapers & Reports Authoritative sector reports](https://www.datacenterdynamics.com/en/whitepapers/)
    *   [Magazines & eBooks Our quarterly mag and mini-mags](https://www.datacenterdynamics.com/en/magazines/)
    *   [MarketWatch Perspectives from our partners](https://www.datacenterdynamics.com/en/marketwatch/)
    *   [Podcasts Listen in to Zero Downtime and partner shows](https://www.datacenterdynamics.com/en/podcasts/)
    *   [Research Surveys and deep dives](https://www.datacenterdynamics.com/en/research/)

*   [Intelligence](https://www.datacenterdynamics.com/en/intelligence/)
*   [Industry Awards](https://www.datacenterdynamics.com/en/industry-awards/global-awards/2026/)
*   [Academy](https://www.datacenterdynamics.com/en/dcdacademy/)
*    Live Events 

Recommended for you...

![Image 3: DCD Connect | London 2026 WebImage2](./assets/img-8b876234.webp)16–17 September 2026  # Connect[DCD Connect | London 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/london/2026/)   

## Live Events

    *   Connect Series
        *   [Connect | London 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/london/2026/)
        *   [Connect | LATAM 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/canc%C3%BAn/2026/)
        *   [Connect | India 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/india/2026/)
        *   [Connect | MENA 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/mena/2026/)
        *   [Connect | Virginia 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/virginia/2026/)
        *   [Connect | Brasil 2026](https://www.datacenterdynamics.com/br/dcd-connect-live/brasil/2026/)
        *   [Connect | New York 2027](https://www.datacenterdynamics.com/en/dcdconnect-live/new-york/2027/)
        *   [Connect | Southern Europe 2027](https://www.datacenterdynamics.com/es/dcd-connect-live/south-europe/2027/)
        *   [Connect | APAC 2027](https://www.datacenterdynamics.com/en/dcdconnect-live/apac/2027/)

    *   Xcelerated Compute Series
        *   [The Xcelerated Compute Show New York](https://www.xceleratedcompute.com/new-york/2027/)
        *   [The Xcelerated Compute Show London](https://www.xceleratedcompute.com/london/2026/)
        *   [The Xcelerated Compute Show Cancun](https://www.xceleratedcompute.com/cancun/2026/)
        *   [The Xcelerated Compute Show São Paulo](https://br.xceleratedcompute.com/saopaulo/2026/)

    *   Investment Forum Series
        *   [Investment Forum London 2026](https://www.datacenterdynamics.com/en/dcdconnect-investment/london/2026/)
        *   [Investment Forum LATAM 2026](https://www.datacenterdynamics.com/es/dcdconnect-investment/cancun/2026/)
        *   [Investment Forum India 2026](https://www.datacenterdynamics.com/en/dcdconnect-investment/india/2026/)
        *   [Investment Forum MENA 2026](https://www.datacenterdynamics.com/en/dcdconnect-investment/mena/2026/)
        *   [Investment Forum Brasil 2026](https://www.datacenterdynamics.com/br/dcdinvestment/s%C3%A3opaulo/2026/)
        *   [Investment Forum New York 2027](https://www.datacenterdynamics.com/en/dcdconnect-investment/new-york/2027/)
        *   [Investment Forum Southern Europe 2027](https://www.datacenterdynamics.com/es/dcdconnect-investment/south-europe-madrid/2027/)
        *   [Investment Forum APAC 2027](https://www.datacenterdynamics.com/en/dcdconnect-investment/apac/2027/)

    *   AI Cities Series
        *   [AI Cities | Zaragoza 2027](https://www.aicitysummit.com/europe/2027/)
        *   [AI Cities | Rio de Janeiro 2027](https://www.aicitysummit.com/latin-america/2027/)

    *   Yotta

    *           *   [Connect | London 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/london/2026/)
        *   [Connect | LATAM 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/canc%C3%BAn/2026/)
        *   [Connect | India 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/india/2026/)
        *   [Connect | MENA 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/mena/2026/)
        *   [Connect | Virginia 2026](https://www.datacenterdynamics.com/en/dcdconnect-live/virginia/2026/)
        *   [Connect | Brasil 2026](https://www.datacenterdynamics.com/br/dcd-connect-live/brasil/2026/)
        *   [Connect | New York 2027](https://www.datacenterdynamics.com/en/dcdconnect-live/new-york/2027/)
        *   [Connect | Southern Europe 2027](https://www.datacenterdynamics.com/es/dcd-connect-live/south-europe/2027/)
        *   [Connect | APAC 2027](https://www.datacenterdynamics.com/en/dcdconnect-live/apac/2027/)

    *           *   [The Xcelerated Compute Show New York](https://www.xceleratedcompute.com/new-york/2027/)
        *   [The Xcelerated Compute Show London](https://www.xceleratedcompute.com/london/2026/)
        *   [The Xcelerated Compute Show Cancun](https://www.xceleratedcompute.com/cancun/2026/)
        *   [The Xcelerated Compute Show São Paulo](https://br.xceleratedcompute.com/saopaulo/2026/)

    *           *   [Investment Forum London 2026](https://www.datacenterdynamics.com/en/dcdconnect-investment/london/2026/)
        *   [Investment Forum LATAM 2026](https://www.datacenterdynamics.com/es/dcdconnect-investment/cancun/2026/)
        *   [Investment Forum India 2026](https://www.datacenterdynamics.com/en/dcdconnect-investment/india/2026/)
        *   [Investment Forum MENA 2026](https://www.datacenterdynamics.com/en/dcdconnect-investment/mena/2026/)
        *   [Investment Forum Brasil 2026](https://www.datacenterdynamics.com/br/dcdinvestment/s%C3%A3opaulo/2026/)
        *   [Investment Forum New York 2027](https://www.datacenterdynamics.com/en/dcdconnect-investment/new-york/2027/)
        *   [Investment Forum Southern Europe 2027](https://www.datacenterdynamics.com/es/dcdconnect-investment/south-europe-madrid/2027/)
        *   [Investment Forum APAC 2027](https://www.datacenterdynamics.com/en/dcdconnect-investment/apac/2027/)

    *           *   [AI Cities | Zaragoza 2027](https://www.aicitysummit.com/europe/2027/)
        *   [AI Cities | Rio de Janeiro 2027](https://www.aicitysummit.com/latin-america/2027/)

    *           *   [Yotta 2026](https://www.yotta-event.com/)

Close modal

## Search Suggestions

*   [Home](https://www.datacenterdynamics.com/en/)
*   [News](https://www.datacenterdynamics.com/en/news/)
*   [The Data Center Construction Channel](https://www.datacenterdynamics.com/en/dcd-data-center-construction-channel-news/)

# Meta's $1.2bn data center in Kuna, Idaho, goes live

Facility is the company's second AI-optimized data center

September 04, 2026 By[Georgia Butler](https://www.datacenterdynamics.com/en/profile/georgia-butler/)[Have your say](https://www.datacenterdynamics.com/en/news/metas-12bn-data-center-in-kuna-idaho-goes-live/#comments)

[Facebook](https://www.datacenterdynamics.com/#facebook)[Twitter](https://www.datacenterdynamics.com/#twitter)[LinkedIn](https://www.datacenterdynamics.com/#linkedin)[Reddit](https://www.datacenterdynamics.com/#reddit)[Email](https://www.datacenterdynamics.com/#email)[Share](https://www.addtoany.com/share#url=https%3A%2F%2Fwww.datacenterdynamics.com%2Fen%2Fnews%2Fmetas-12bn-data-center-in-kuna-idaho-goes-live%2F&title=Meta%27s%20%241.2bn%20data%20center%20in%20Kuna%2C%20Idaho%2C%20goes%20live%20-%20DCD)

Meta's data center in Kuna, Idaho, is now officially serving traffic.

The company first announced plans for the [data center campus in Kuna](https://www.datacenterdynamics.com/en/news/meta-announces-new-data-center-in-kuna-idaho/) in Ada County in early 2022.

Meta originally aimed to invest $800 million in developing a 960,000 sq ft (89,187 sqm) facility, but the facility was one of around a dozen sites [temporarily paused](https://www.datacenterdynamics.com/en/news/metas-kuna-idaho-data-center-latest-to-be-paused-in-ai-redesign-rethink/) as part of a design re-scoping to accommodate AI infrastructure and liquid cooling.

[](https://media.datacenterdynamics.com/media/images/FB_Meta_Kuna_Idaho.original.jpg)![Image 5: FB Meta Kuna Idaho.jpg](./assets/img-edfd705e.jpg)

– Meta

The company's vice president of data center development and strategy, Gary Demasi, revealed that the data center had launched in a [LinkedIn post](https://www.linkedin.com/posts/gmdemasi_metas-kuna-data-center-is-officially-serving-ugcPost-7501386096610582528-eqnh/?utm_source=share&utm_medium=member_desktop&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs).

Demasi wrote: "Meta's Kuna Data Center is officially serving traffic — our second AI-optimized facility in our fleet, now online in Idaho, representing an overall investment of $1.2 billion."

He noted that the site is using a closed-loop, liquid-cooled system that "uses zero water for most of the year," and the company has invested more than $100 million in a dedicated water and wastewater system for the City of Kuna.

Meta has matched the electricity use of the data center with 100 percent clean and renewable energy, having added 645MW of new renewable energy to Ada County.

Demasi added: "Building AI infrastructure at this scale is a long-term commitment, and we do it in partnership with the places that we call home — planning years ahead with utilities, funding the systems our facilities depend on, and investing in schools and organizations that will outlast any single building. A data center should leave a community measurably stronger than it found it. That's the standard we're holding ourselves to here in Kuna, and across our communities around the world."

Meta launched its first AI-optimized data center in July of this year. That facility was located in [Temple, Texas](https://www.datacenterdynamics.com/en/news/meta-starts-operations-at-data-center-in-temple-texas/), and was similarly one of the sites that saw construction paused in 2022.

Kuna is located in the Boise metropolitan area. Boise has a relatively small data center market. Diode Ventures filed for a project in the area in [February 2025](https://www.datacenterdynamics.com/en/news/diode-ventures-plans-620-acre-data-center-park-in-kuna-idaho/).

 Stay ahead of the latest data center construction channel trends. Subscribe to DCD. 

[Create an Account to Subscribe Now](https://www.datacenterdynamics.com/en/create-account/)
