格式版本: 2
标题: "Robust Joint Planning of EV and eBus Charging Infrastructure with PV Self-Consumption under Demand Uncertainty"
原文链接: "https://arxiv.org/abs/2608.18844"
发布日期: "2026-08-19"
发布时间校准状态: "found"
发布时间需复核: "否"
发布时间来源: "rule:local:strict_original_body"
发布时间证据: "**\\[v1\\]** Wed, 19 Aug 2026 12:06:50 UTC (748 KB)"
发布时间校准原因: "规则确认唯一严格发布时间，来源 local:strict_original_body"
发布时间校准置信度: "high"
发布时间候选数量: 18
发布时间严格候选数量: 6
发布时间原页读取状态: "source template page reused from URL open"
发布时间未找到原因: ""
发布时间校准时间: "2026-08-20T15:21:59+08:00"
发布时间仲裁状态: "skipped"
发布时间仲裁尝试次数: 0
发布时间仲裁耗时毫秒: 0
发现时间: "2026-08-20T15:18:01+08:00"
入库时间: "2026-08-20T07:21:59.563Z"
来源平台: "arXiv 学术论文搜索"
搜索渠道: "source_template"
搜索词: "https://arxiv.org/search/?query=deployment&searchtype=all"
匹配关键词:
  - "deployment"
相关厂家:
  []
相关专家:
  []
内容类型: "网页"
抓取工具: "Free Fetch + Defuddle"
清洗工具: "Defuddle Markdown + Defuddle/Readability 正文提取"
原始附件:
  []
AI优质: "否"
AI打分: 2
AI分档: "非优质"
AI质检状态: "不通过"
AI打分理由: "正文为电动汽车与电动公交充电基础设施规划论文，主题完全偏离超节点/AI Rack/机柜级AI基础设施，仅搜索词含deployment，实质无关。"
AI质检模型: "ali-deepseek-v4-flash"
AI质检时间: "2026-08-20T15:24:18+08:00"
AI主题相关性: 0
AI来源权威性: 0
AI新颖性: 0
AI技术细节: 0
AI商业部署信号: 0
AI完整性: 2
AI摘要: "本文提出混合整数线性规划（MILP）框架，用于在需求不确定下联合规划电动汽车与电动公交充电基础设施，协同优化充电桩选址、容量、技术选型、eBus调度及光伏自消费下的充电时段。"
AI摘要模型: "ali-deepseek-v4-flash"
AI摘要时间: "2026-09-07T03:19:09.063Z"
采集批次: "2026年8月20日14点19分32秒"
采集批次ID: "20260820-141932-079"
去重键: "https://arxiv.org/abs/2608.18844"
---

## Electrical Engineering and Systems Science > Systems and Control

## Title:Robust Joint Planning of EV and eBus Charging Infrastructure with PV Self-Consumption under Demand Uncertainty

Authors:[Biswarup Mukherjee](https://arxiv.org/search/eess?searchtype=author&query=Mukherjee,+B)

[View PDF](https://arxiv.org/pdf/2608.18844) [HTML (experimental)](https://arxiv.org/html/2608.18844v1)

> Abstract:This paper presents a mixed-integer linear programming (MILP) framework for joint electric vehicle (EV) and electric bus (eBus) charging-infrastructure planning with photovoltaic (PV) self-consumption. The model co-optimizes charger siting, sizing, technology selection, eBus-to-depot assignment, and hourly charging schedules. A deterministic MILP is first formulated as a nominal benchmark and then extended to a scenario-based robust min--max formulation under vehicle energy-demand uncertainty. The robust model uses shared first-stage infrastructure decisions and scenario-specific operating decisions, and minimizes infrastructure cost plus the worst-case scenario operating cost through an epigraph reformulation. Soft-feasibility penalties quantify unmet charging energy, terminal state-of-charge (SOC) shortfall, and capacity violations under stressed scenarios. A 50-node case study shows that route-segment eBus demand and PV weighting alter charger deployment, technology mix, and grid import, while V2G enables hard-feasible robust operation at sufficiently large penalty weights. These results highlight that effective long-term infrastructure planning must simultaneously account for diverse vehicle fleets, operational strategies that adapt to different scenarios, and node-level constraints on charging capacity.

| Comments: |  |
| --- | --- |
| Subjects: | Systems and Control (eess.SY) |
| Cite as: | [arXiv:2608.18844](https://arxiv.org/abs/2608.18844) \[eess.SY\] |
|  | (or [arXiv:2608.18844v1](https://arxiv.org/abs/2608.18844v1) \[eess.SY\] for this version) |
|  | [https://doi.org/10.48550/arXiv.2608.18844](https://doi.org/10.48550/arXiv.2608.18844) |

## Submission history

From: Biswarup Mukherjee \[[view email](https://arxiv.org/show-email/b6148f0d/2608.18844)\]  
**\[v1\]** Wed, 19 Aug 2026 12:06:50 UTC (748 KB)

[Which authors of this paper are endorsers?](https://arxiv.org/auth/show-endorsers/2608.18844) | Disable MathJax ([What is MathJax?](https://info.arxiv.org/help/mathjax.html))